Projects

Projects

Projects: Jam Handling System

< Back to Projects

Jam Handling System

Jam Handling System

Objectives

A biscuit manufacturing client commissioned TEG to provide project engineering and management of a jam handling system to drive efficiency in their manufacturing process. The project scope included:

  • Jam delivery to depositer.
  • Saving in material costs and reduced manual handling.

Challenges

  • Installing equipment in a working factory environment.

Results

The project was completed on budget and without incident. The facility has provided the required payback giving labour and material savings.