Meadow Lea Boiler & Steam System

Meadow Lea Boiler & Steam System

Objectives

Meadow lea commissioned TEG to undertake project management of their new steam boiler after the failure of the existing main steam boiler on site. The project required a new 6mW boiler and capital value was $850k.

Challenges

Failure of the main steam boiler on site required temporary boiler to be installed to allow production to continue for several months while the new boiler was manufactured and delivered.

Results

The change-over to the new boiler was trouble-free and the new boiler has proved to be a reliable and robust addition to the site.